Previous Chapter Back to Scoreboard 2556 Manual Next Chapter

SCOREBOARD INSTALLATION

This part of the manual describes the mechanical and electrical installation of the scoreboard.

One of the items listed below must be purchased in order to complete the installation:

  • Control cable (length dependent upon installation site layout, but not to exceed 1000 feet between a console and the scoreboard)
  • SL-230  / 330RF Modem (2 sets required on separate channels)

Items not provided by Electro-Mech Scoreboard Company that are necessary for installation:

  • Wall fasteners
    • Grounded NEMA 5-15R 120 VAC receptacles for the 2 control consoles at the scorekeeper’s table.

Electro-Mech Scoreboard Company performs installations in some areas.  In other areas, we can help you contact an independent installer.  In areas in which installation service is not available from Electro-Mech Scoreboard Company, we will make every effort to answer your installation questions.  Qualified personnel should perform the scoreboard installation.  Consult national and local codes before installation.

 

Previous Chapter Back to Scoreboard 2556 Manual Next Chapter